I have a friend who wants to install there standard size (1700 x 700) bath parallel with the floor joists and in the middle of the room/joist span. The joists are 47 x 144mm over a span of 2.4 metres @400mm spacings. And the bath will sit over 2 joists. The bath will hold approx 180 litres and weighs 30kg empty or approx 210kg when filled. Strengthening floor joists under a bath.Floor joist below bathtub notched on both top and bottomWater Cylinder & JoistsReinforce Joists for water tanksSee more results

Floor Framing for Bathtubs | Home Guides | SF Gate

Floor Frames Must Be Designed to Carry the Load. The load capacity of the floor under the tub is based primarily on the size, spacing, and span of the floor joists.

How to Replace a Rotten Floor Under a Shower | Home Guides ...

A plywood subfloor under a shower, also known as underlayment, is vulnerable to moisture damage that can rot the wood. Where a rotten subfloor is left unattended, the rot may extend to the floor ...

Support For Bathtub | The Building Code Forum

3.3.1.5.3 Single or continuous floor joists supporting concentrated loads Where concentrated loads exceeding 300 pounds must be supported by floor joists, the joists supporting the load shall be doubled (see Figure 3.5d) That figure, 3.5d, specifically shows joist doubled under the front and back of the tub. Water SizeDouble Floor Joists Under Non-bearing Walls? | The Building ...Nov 29, 2016Water Closet ClearancesBackwater ValvesSee more results

How to Install a Bathtub Drain When a Joist Is in the Way ...

How to Replace a Rotten Floor Under a Shower In new construction, you should readily be able to site a bathtub so its drain falls between joists, rather than on top of a floor joist below.

How to Prepare a Subfloor for a New Fiberglass Shower Pan ...

1. Remove debris at the area of the subfloor where the shower pan installs, using a shop vacuum. Hammer down any protruding nails used to fasten the subfloor to the floor joists below.

How to Level a Floor for a Shower Base | Hunker

Vacuum and clean the floor thoroughly. Knock down any high places you see or feel with a hammer. Remove any excess, hardened glue from the old shower base by using a scraper or spatula. Use a level to make sure the floor is even. Check the floor for level. Lay a 4- or 6-foot level on the floor from front to back. Check the level's bubble; if the floor is level, the bubble will be in the center section. Go to the marked areas one at a time and lay down shims. Use the level to show where you should place the shims. Raise and lower the shims, with the level resting on them, to see how many shims are needed to raise the floor to level. Screw down the shims with your galvanized flat-head screws and screw gun. Recheck the floor for level, with the level resting on the screwed-down shims, and adjust them by repositioning, adding or removing shims as needed.

Easy Ways to Replace Floor Joists: 8 Steps (with Pictures)

May 06, 2019 · Pry the floor joist from the subfloor with the back of your hammer. Start by cutting out a small 1–2 in (2.5–5.1 cm) section of the floor joist with a reciprocating saw. This will create a weak spot. Then use pry bars and your reciprocating saw to pry and cut the floor joist away from the subfloor. Views: 7.4K

Help! What to do shower drain/Joist? | Terry Love Plumbing ...

If you've got some carpentry skills, you can double up (sister) the joists on either side and box out the area with some perpendicular framing sections then just put in some small-ish braces in a few spots to support the shower floor between the doubled joist spans (and also provide some support for the drywall below). Distance between trap and shower drain | Terry Love Plumbing ...Jun 19, 2020Joist in the way of new shower drain | Terry Love Plumbing ...Apr 01, 2015Joist meets Drain - now what?Replacing shower valve - what steps?See more results

How to Replace a Rotten Floor in Front of a Bathtub | Home ...

Dec 19, 2018 · Locate the floor joists. Joists typically run either 16 or 24 inches apart and under subfloor seams either lengthwise or width-wise. If you can't be certain where the joists are, proceed with ...

Easy Ways to Replace Floor Joists: 8 Steps (with Pictures)

May 06, 2019 · Pry the floor joist from the subfloor with the back of your hammer. Start by cutting out a small 1–2 in (2.5–5.1 cm) section of the floor joist with a reciprocating saw. This will create a weak spot. Then use pry bars and your reciprocating saw to pry and cut the floor joist away from the subfloor. Views: 7.4K

How to Replace a Rotten Floor in Front of a Bathtub | Home ...

Dec 19, 2018 · Locate the floor joists. Joists typically run either 16 or 24 inches apart and under subfloor seams either lengthwise or width-wise. If you can't be certain where the joists are, proceed with ...

Does Sistering Joist Short of Wall Support Increase Floor ...

Does my floor really need to be sized to handle 60 lbs/sq ft? Joists are running parallel to the length of the shower. Instead of looking at the weight in the area of the shower, do I need to look at the total weight across the entire joist span (13'4") and shower width (3.5') which is an area of 46.66 sq ft?

Reinforcing Floor Joists - Concord Carpenter

Reinforcing floor joists is best done by doubling of floor joists. Doubling of joists is recommended under walls, heavy objects like tubs and at large openings. Doubling of joists can solve alot of problems like sagging, uneven or undersized floor joists.

Double Floor Joists: What are they and why use them? - How To ...

May 12, 2013 · Double floor joists are two joists side by side that are usually nailed or screwed together along the length. Why would you use a double floor joist? The main reason for doubling up floor joists is to double the strength of a single floor joist. This allows you to install a supporting post off the double floor joist to hold a second storey or a ...

3" pipe through joists | Terry Love Plumbing Advice & Remodel ...

Apr 29, 2017 · The 2x10 floor joists supporting my bathroom span 15' at 16" o.c.. I doubled them up to reduce deflection for tile - glued and screwed them together. I rerouted my toilet and ran 3" pipe across 4 (double) joists, very precisely drilling a 3-5/8" hole, falling 1/4" per foot.

How To Relocate Floor Joist For Plumbing Pipes – Using Double ...

http://www.homebuildingandrepairs.com/repairs/framing/index.html Click on this link if you're looking for more floor framing repair videos. This is the secon... Video Duration: 6 minViews: 103.7KAuthor: gregvancom

Details for Non-Bearing Walls Parallel to Floor Joists – Trus ...

However, the floor joists must also be adequate to support the additional load from the wall. This verification can be achieved with our Forte Software. Nonetheless, this does not ensure good floor performance. For better performance, the designer may wish to add a joist or blocking panels below the non-bearing wall.

Install Shower Base SBI-0320 - The Onyx Collection

Sub Floor Wall Studs Wood Blocks for wall are bonded into the base Double Stud for shower door support Frame exterior return wall after base is installed Tile Flooring - Suggestions Vinyl Flooring - Suggestions Flexible Grout or Silicone Underlayment Tile Floor Sub Floor Floor Joists Sub Floor Floor Joists Laminate or vinyl Flooring Runs Under ...

Distance between trap and shower drain | Terry Love Plumbing ...

Jun 19, 2020 · I have a derivative question. We are rerouting the drain from a bathtub in a basement ceiling in my brother-in-law's house. Originally the trap was directly under the tub, which then put the drain about 8 inches or so beneath the joists making a very unsightly intrusion from the ceiling where it then went diagonally about 5 feet to the stack on the other side of the wall.

Double Floor Joists: What are they and why use them? - How To ...

May 12, 2013 · Double floor joists are two joists side by side that are usually nailed or screwed together along the length. Why would you use a double floor joist? The main reason for doubling up floor joists is to double the strength of a single floor joist. This allows you to install a supporting post off the double floor joist to hold a second storey or a ...

How To Relocate Floor Joist For Plumbing Pipes – Using Double ...

http://www.homebuildingandrepairs.com/repairs/framing/index.html Click on this link if you're looking for more floor framing repair videos. This is the secon... Video Duration: 6 minViews: 103.7KAuthor: gregvancom

Is It Common Practice To Double Up The Subfloor?? - Framing ...

Sep 20, 2007 · There was a time when oak was put over diagional boards. Diagonal so the flooring nails didnt end up in a long joint. Oak was used even if the finished floor was going to be vinyl tile. I think the 2 floor was just a left over from that practice and until the T&G ply took off.

2020 Cost of Repairing Floor Joists - Estimates and Prices Paid

How much repairing floor joists should cost. Average costs and comments from CostHelper's team of professional journalists and community of users. If only a few joists are rotted primarily at the bottom, they can be repaired using a process known as sistering -- after the rot is cleaned away and the timber treated to prevent more problems, a new joist is laid beside the old one and fastened to it.

Structural Home Repairs – How To Install Double Floor Joist ...

http://www.homebuildingandrepairs.com/repairs/framing/index.html Click on this link for more information about structural home repairs, house framing and do-... Video Duration: 6 minViews: 4.9KAuthor: gregvancom

Does a Floor Need Extra Support When Installing a Cast Iron ...

If the floor was built using the general 16-inch spacing, you can expect a bathroom floor to safely hold 40 psf. So, a 5-by-10 foot bathroom floor generally supports up to 2,000 pounds. This provides sufficient support for most cast iron bathtubs, which run under 500 pounds, even when full.

Help with Zero entry, Curbless Shower - Houzz

The depression is created by lowering the floor joists, etc as your contractor says. "Our contractor however says that doing a curbless shower will require different framing (shorter floor joists etc.) so that the actual shower area (before tiling) is slightly lower than the rest of the bathroom floor." A trench, or line drain is ...

Joist cut under bathroom - YouTube

Apr 21, 2010 · How to repair a rotted floor under the toilet ... DIY How to Renovate the Tub / Shower from A to Z ... 2:40:24. How To Relocate Floor Joist For Plumbing Pipes – Using Double Joist and Headout ... Views: 9.9KAuthor: RexAtPMSVideo Duration: 1 min

How to Fix and Quiet Mobile Home Floor Squeaks | Hunker

Mobile Homes and Modular Homes are factory built, and are built on a steel chassis. After moving to a permanent site, and set up, they can sometimes develop annoying floor squeaks. I will tell you how to eliminate them.

3" pipe through joists | Terry Love Plumbing Advice & Remodel ...

Apr 29, 2017 · The 2x10 floor joists supporting my bathroom span 15' at 16" o.c.. I doubled them up to reduce deflection for tile - glued and screwed them together. I rerouted my toilet and ran 3" pipe across 4 (double) joists, very precisely drilling a 3-5/8" hole, falling 1/4" per foot.

Is It Common Practice To Double Up The Subfloor?? - Framing ...

Sep 20, 2007 · There was a time when oak was put over diagional boards. Diagonal so the flooring nails didnt end up in a long joint. Oak was used even if the finished floor was going to be vinyl tile. I think the 2 floor was just a left over from that practice and until the T&G ply took off.

Joist cut under bathroom - YouTube

Apr 21, 2010 · How to repair a rotted floor under the toilet ... DIY How to Renovate the Tub / Shower from A to Z ... 2:40:24. How To Relocate Floor Joist For Plumbing Pipes – Using Double Joist and Headout ... Views: 9.9KAuthor: RexAtPMSVideo Duration: 1 min

Double TJI® Joists – Trus Joist Technical Support

However, if the loading is applied from above through floor sheathing, through a load bearing wall, or post that rests on both joists, then no attachment between joists is required. When a load is applied to one side of a double joist (by another joist or header, for example), then the double joist must be connected together so both joist ...

How to Build a Floor for a House : 11 Steps (with Pictures ...

The floor joists will run to the inside of the stairway and be headed off with a rim joist on the inside side of the stairway. Stairway opening in floor joists. Notice how the rim joist sits on the inside of the stairwell wall so the floor joists can bear on the wall. The two joists at the top of the stairs provide additional support to hold ...

Understanding Floor Joist Spans - The Spruce

True floor joist span calculations can only be made by a structural engineer or contractor. This sample table gives minimum floor joist sizes for joists spaced at 16 inches and 24 inches on-center (o.c.) for 2-grade lumber with 10 pounds per square foot of dead load and 40 pounds of live load, which is typical of normal residential construction:

How to Install Curbless Showers for Existing & New Homes

Aug 12, 2016 · Same as A-1 above, but notch the floor joists before the subfloor is installed, or, the best practice is to possible build the entire floor joist system 3” lower under the shower inside its own 2×12” box frame.If the floor plan is well thought out, curbless showers in new construction are can be built larger (at least 5’ x 6’) than in ...

Floor Squeaks - Mobile Home Doctor

If the squeak is under a carpeted area you can try driving screws through the carpet and into the floor joists. I have seen various kinds of metal supports that are designed to be placed between the floor joists under the home and then tightened against the floor boards.

Fixing Bouncy Floors (DIY)

By building a wall under joists, you divide the span. The floor above will be stiffest if you place the wall in the middle of the joists. If you build a wall to support joists, be sure to place a stud directly and tightly under each joist. If the wall will have a doorway, place a double 2×6 header above the door’s rough opening.

How to Insulate Under Floors in a Basement or Crawlspace ...

installing roll insulation in ceiling of basement which is under floors of living space my basement is heated but a smaller amount than up in living space (usually 66-68 upstairs and 58-60 at the same time in basement) my question is about the kraft paper facing, I think it should face the basement because of any moisture in basement.

Sistering Floor Joists: 6 Mistakes to Avoid | DoItYourself.com

Generally, newer home floor joists are made from 2x8s or new engineered 'I-beams.' Older homes, however, may have 2x6s instead. While it is a good idea to replace rotted material with 2x8s, it may require some notching to fit between the sub floor and ledger board.